Downdraft table
Coordinate the airflow concept, exhaust connection, make-up air and commissioning method with the room ventilation designer.
Post-mortem room equipment
Compare autopsy tables by intended procedure, work-surface arrangement, sink and drainage needs, ventilation concept, transfer method and the utilities available in the room.
Engineering notice: dimensions, material grade, load, sink and grinder configuration, lifting functions, airflow, duct connection, water, drainage and electrical requirements vary by model. Coordinate the current technical drawing with qualified local specialists.

Use these pathways to identify the required functions. Inclusion of a function in one model does not mean it is standard on every table.
Coordinate the airflow concept, exhaust connection, make-up air and commissioning method with the room ventilation designer.
Confirm hot and cold water, pressure, inlet points, drain size and location, waste treatment and cleaning procedures.
Check the transfer approach, height range, rated load, platform compatibility, operating method and maintenance access.
No. The table’s connection and capture concept must be integrated with ductwork, fans, make-up air and the room pressure strategy by qualified project specialists.
No. Confirm every connection size, location, demand and local standard against the selected model’s current technical drawing and the facility design.
Approve the equipment drawing, utility responsibilities, delivery route, anchoring or mobility, testing and commissioning method, included accessories and the installation scope.
Send the room drawing, procedure and utility information together for a configuration review.